Our Completed Projects

Sl.No W.O awarded Name of Work Completion Date
1. Bangladesh Army Construction of U-loop, Underpass and Ramp under IMPROVEMENT OF JATRABARI INTERSECTION (INCLUDING EQURIA-BABUBAZAR LINK ROAD) TO PACHCHAR-BHANGA THROUGH MAWA ROAD OF DHAKA-KHULNA (N-8) HIGHWAY TO 4 LANE WITH SEPARATE LANE FOR SLOW MOVING VEHICLE. 22-02-2023
2. Bangladesh Army Construction of 1630.00 meter Ring Dyke/Approach Embankment in Polder No. 7/1 In-between Km. 6.800 to Km. 9.520 Along the R/B of Kobadak River at Chakla, Protapnagar, Upazila- Assasuni, District- Satkhira. 08-05-2022
3. Bangladesh Army Construction of 345.00 meter Ring Dyke/Approach Embankment in Polder No. 7/2 In- between Km. 56.500 to Km. 56.905 Along the R/B of Kobadak River at Kurikawnia, Protapnagar, Upazila- Assasuni, District- Satkhira. 08-05-2022
4. Bangladesh Army Temporary protective work to meet the emergency situation of the valuable infrastructures of Bangladesh Army at left bank of the Meghna river from km 4.042 to km 6.042km= 2km at swarnadwip (Jahizzar Char) in Hatia & Subarnachar) upazila district Noakhali. 30-03-2020
5. Bangladesh Navy Resectioning/Reconstruction/ Rehabilitation Embankment, Damaged Polder in Maheshkhali & Kutubdia Upazila Under Cox’s Bazar District.
6. Civil Surgeon, Rangamati Rangamati Civil Surgeon Medical Equipment supply Work 26-06-2019
7. Bangladesh Railway Construction of new DUAL GAUGE SINGLE Railway Line From DOHAZARI To COX'S BAZAAR.
8. LGED Road Construction work from Balia Dighi to Barabari Madrasha in Ullapara Upazilla. 12-04-2017
9. Bangladesh Power Development Board Land Development Work for Construction of 150MW Peaking power plant at Shikalbaha, Chittagong. 23-10-2010
10. Bangladesh Water Development Board Re-excavation of Gangnai river from km 3.750 to km. 5.500 under Gangai River Sub-project in upazilaSidgonj, District: Bogra, under Bogra O&M Division, BWDB, Bogra 04-11-2009
11. RHD Renovation and Beautification of Kean Bridge and Bridge site under Road division, Sylhet Road circle 07-09-2009