Description

* Bangladesh Army / MoDM
Construction of 17 X Five Storied Residential
Building with Pile Foundation and other internal
Building Services-17 Buildings.

* Bangladesh Army / RHD
Construction of U-Loop Rigid Pavement, Drain,
Ramp at Hasnabad, Postogola under DhakaKhulna (N-8) Project.

*Bangladesh Army / BWDB
3 Packages of Bridge Foundation Treatment Works
for “Dredging of Bangali-Karotoa-FuljorHurasagor River System” With Bank Protection.

*Bangladesh Army / BWDB
Construction of 1630 m Ring Dyke/embankment
along with two Closure of 60 m & 30 min polder
no-7/1 in between km 6.800 to km 9.520 along the
R/8 of Kobadak river at Chakla, Asashuni Upazila
under Satkhira O&M Division-2, BWDB,
Satkhira.

* Bangladesh Army / BWDB
Construction of 345 m Ring Dyke/embankment &
60 m closure in polder no-7/2 in between km 56.500
tokm 56.905 along the R/B of Kobadak river at
Kurikawnia, Protapnagar, Asashuni Upazila under
Satkhira O&M Division-2, BWDB, Satkhira.

*Bangladesh Army / BWDB
Temporary protective work to meet the
emergency situation of the valuable
infrastructures of Bangladesh Army at left bank
of the Meghna river from km 4.042 to km
6.042km= 2km at Swarnadwip (Jahizzar Char) in
Hatia & Subarnachar) Upazila, District Noakhali.

Project Description

Construction of Emergency Ring Dyke/Closure/Strengthening of Existing Damaged Embankment at ...

Release Date:

12/30/2020

Client:

Bangladesh Army

Category: