Description

3 Packages of Bridge Foundation Treatment Works
for “Dredging of Bangali-Karotoa-FuljorHurasagor River System” With Bank Protection.

Construction of 1630 m Ring Dyke/embankment along with two Closure of 60 m & 30 min polder no-7/1 in between km 6.800 to km 9.520 along the R/8 of Kobadak river at Chakla, Asashuni Upazila under Satkhira O&M Division-2, BWDB, Satkhira.

Construction of 345 m Ring Dyke/embankment & 60 m closure in polder no-7/2 in between km 56.500 tokm 56.905 along the R/B of Kobadak river at Kurikawnia, Protapnagar, Asashuni Upazila under Satkhira O&M Division-2, BWDB, Satkhira.

Re-excavation of Gangnai river from km 3.750 to km. 5.500 under Gangnai River Sub-project in Upazila Shibganj, District: Bogura, under Bogura O&M Division, BWDB, Bogura.

Temporary protective work to meet the emergency situation of the valuable infrastructures of Bangladesh Army at left bank of the Meghna river from km 4.042 to km 6.042km= 2km at Swarnadwip (Jahizzar Char) in Hatia & Subarnachar) Upazila, District Noakhali.

Re-excavation of Gangnai river from km 3.750 to km. 5.500 under Gangnai River Sub-project in Upazila Shibganj, District: Bogura, under Bogura O&M Division, BWDB, Bogura.

Dredging of Bangshai River from Chainage km.00.00 to km. 26.05, Total of 26.05Km

Project Description

Dredging of Bangshai River from Chainage km.00.00 to km. 26.05, ...

Release Date:

02/10/2023

Client:

Bangladesh Water Development Board

Category: